Covid-19 Method Statement
DIY Delivery
In accordance with UK Government Guidance 2021
Method Statement:
1) Access
1.1) Necessary arrangements should be made by the client to ensure that there is a clear path to the site of installation. There should be no one working/walking in the immediate vicinity of the designated area.
1.2) The client shall ensure that there is adequate parking space directly outside of the delivery area. Where this is not possible, the hirer should contact The Beverley Events Company to advise prior to installation.
1.3) It is the homeowners responsibility to inform neighbours where access to the property is shared.
2) Delivery/Unloading/Distribution
2.1) Equipment will be delivered in contained packaging to protect it against damage and contamination
2.2) All items will be off-loaded by hand and situated in the immediate vicinity of the clients preferred entrance, taking care to avoid any damage to the products and surrounding area.
3. Collection
3.1) The client will ensure that all sheets, quilt covers, pillowcases and mattress protectors are removed and placed in the bin liners provided. The bin liners must be sealed prior to collection
3.2) The equipment must be placed in the entrance way ready for collection. When The Beverley Sleepover Company arrive to collect the equipment, the client must maintain a safe distance of 2m at all times
3.3) Necessary arrangements should be made by the client to ensure that there is a clear path to the site of collection. There should be no one working/walking in the immediate vicinity of the designated area.
4. Cleaning of equipment between hires
4.1) The Beverley Sleepover Company will ensure that sheets, quilt covers, and mattress protectors are all washed at 60 degrees.
4.2) All accessories will be wiped on all surfaces with soapy water/antibacterial wipes/antibacterial spray and a cloth
5. Cleaning of Vehicle
5.1) The inside of the vehicle used for transportation will be cleaned using antibacterial wipes/cloths and detergent
5.2) The vehicle will be dried fully before being used again
6. Housekeeping / Waste Disposal
6.1) We would reasonably expect working areas to be clear of debris prior to our work commencing. Our company will endeavour to maintain a clear working area, and remove any of our own rubbish.
6.2) Any bin liners/bags used for bedding will be first placed in a separate, uncontaminated bag, sealed and then disposed of (duty of care to the Bin Disposal Team)
6.3) Any PPE that is not reusable should be disposed of in a sealed bag.


